SECR introduces three-phase MEMU
   Date :08-Sep-2019

 Newly introduced MEMU. (R) Interiors of the train to run between Gondia-Ballarshah stations.
 
Staff Reporter :
 
South East Central Railway’s (SECR) Nagpur Division have rolled out three-phase Electric Supply MEMU (Mainline Electric Multiple Unit) train on Saturday. The 12-coach train (3 Motor Car + 9 Trailer Car) has higher acceleration and deceleration and a host of passenger-friendly features. The train will replace existing Diesel Electric Multiple Unit (DEMU).
 
The train completed its first journey between Gondia-Ballarshah stations as Train No. 68804. It will run between Gondia-Chandafort-Ballarshah and Gondia-Balaghat-Samnapur section of Nagpur division everyday. The three-phase MEMU is an up-gradation over existing single phase MEMU trains. The rake is highly advantageous as it propels with the three-phase AC propulsion system consisting of insulated-gate bipolar transistor and facilitates improved acceleration and braking.
 
The rake is equipped with various sensors, which makes it more comfortable and safe for Loco Pilots. Each coach comprises of computer control which helps in braking operation, Fire safety system, LED light, audio-visual systems, information of upcoming station stoppages for passenger etc. The coaches have air suspension for better riding comfort to passengers. The energy-efficient electric traction propulsion system supported by regenerative braking can save up to 35% energy compared to conventional MEMUs. The electricity generated in this process would be fed into the grid. The energy-efficient units require less maintenance. Divisional Railway Manager (DRM) Shobhana Bandopadhyaya appealed the passengers to take advantage of the new train.