Staff Reporter :
THE much-awaited IndoraDighori flyover witnessed
scenes of celebration and chaos
on the very first day of operation as thousands of citizens
thronged the newly opened
corridor for a joyride, triggering traffic congestion at several points along the 8.9-km-long
structure.
The Rs 998 crore flyover, inaugurated on Saturday by Nitin
Gadkari, Union Minister for
Road Transport and Highways,
in the presence of Chief
Minister Devendra Fadnavis,
has been one of city’s most
anticipated infrastructure projects. After months of repeated
postponements despite the
structure being substantially
ready, citizens wasted little time
in experiencing what
promises to be a faster commute between Indora and
Dighori.
The overwhelming response,
however, turned parts of the
flyover into virtual bottlenecks.
The elevated rotary at Ashok
Square emerged as the biggest
congestion point as a steady
stream of cars and two-wheelers converged from five directions. The traffic was crawling
for long stretches around the
rotary as motorists slowed
down to take in the new structure. The commuters using the
flyover experienced similar traffic congestion on Sunday
evening as well.
It has been observed that the
major cause behind the recurring congestion is that the flyover has become an impromptu selfie destination.
Several commuters stopped
their vehicles, particularly near
the Ashok Stambh at the Ashok
Square rotary, to click photographs and videos.
The resulting interruptions further
slowed traffic movement and added to the congestion. Vehicular movement was also significantly higher than usual owing to the festive season. Large number of devotees travelling towards Jaripatka to visit Ganesh pandals used the new flyover, adding to the already heavy traffic load on the corridor.
Commuters also reported confusion over inadequate signage at key locations. The ramps near Daga Memorial Women’s Hospital became a particular point of concern, with many motorists unsure whether the facilities were meant only for exiting the flyover or could also be used as entry ramps.
In the absence of clear directional signs and ‘No Entry’ boards, several motorists were seen attempting to climb the ramps, only to find themselves facing vehicles descending from the flyover.
The situation created confusion and raised safety concerns, especially during peak traffic hours. A similar problem was observed at the Ashok Square rotary, where motorists unfamiliar with the area struggled to identify which ramp led to which destination. Although some directional signs had been installed, several were partially obscured by political hoardings erected ahead of the inauguration programme. While the opening-day rush reflected the
public enthusiasm surrounding the landmark project, the
traffic snarls and confusion highlighted the urgent need for clear signage, better traffic management and enforcement measures before regular traffic volumes stabilise on the city’s newest flyover.