RAIPUR :
BASTAR’S crucial rail connectivity with Odisha and
Visakhapatnam remains severely disrupted after relentless rain
triggered major landslides along
the Kirandul-Kottavalasa (KK)
railway line, damaging tracks
between Maligura and
Chhatariput in East Coast
Railway’s Rayagada Division.
The devastation is extensive.
Earth supporting portions of the
track have slipped away, leaving
rails and sleepers precariously
suspended, while recurring soil
movement and debris from
adjoining slopes have made the
section unsafe for operations.
A 132-kV electricity transmission tower also collapsed near
Maliguda amid heavy rain and
strong winds, further complicating restoration. Railway traffic on the Jagdalpur-Koraput corridor has consequently taken a
severe hit.
East Coast Railway has cancelled the KirandulVisakhapatnam Passenger, Kirandul-Visakhapatnam
Express and Rourkela-Jagdalpur Express services on specified dates. The Howrah-Jagdalpur Express and
Bhubaneswar-Jagdalpur Hirakhand Express have also been
short-terminated at Koraput, with corresponding return
services short-originating there.
Freight movement, vital to the mineral-bearing Bastar
region, has also been affected by the disruption. Restoration
teams are working against difficult terrain and continuing
rainfall.
Heavy earth-moving machinery has been pressed
into service to remove debris, rebuild the washed-out formation and stabilise vulnerable stretches before tracks can
be certified fit for operations. East Coast Railway had
deployed around 300 workers across multiple rain-affected locations in Rayagada Division as landslides, soil slips
and waterlogging emerged at several points.
Rayagada Divisional Railway Manager Amitabh Singhal
and senior engineering officials have inspected the affected corridor and are supervising restoration. Railway authorities have indicated that operations will resume only after
safety inspections establish the section’s fitness for traffic.
The disruption has exposed the vulnerability of this
strategically important hill railway, where prolonged rainfall can destabilise cuttings, embankments and slopes. For
Bastar, every additional day of closure means mounting
disruption to passenger movement and freight operations.
With restoration still under way, passengers have been
advised by East Coast Railway officials to verify train status before commencing journeys.